jan2013We have completed the cement work on our “extra heavy duty” floor. Final slab was poured 12-31-12 ! The floor is designed to hold increased sized and weight equipment as we expand our machining capabilities. Concrete in the floor  is 12” + in thickness with two 5/8 mats of re-rod. The next three steps to be completed will be:

  1. Painting and fire suppression system in January.
  2. Electrical and permanent lighting in February,
  3. Be able to move some equipment into the new space in March 2013.